PATTERSON RD over JOHN DAY RIVER

0.05 M N. JCT HWY 26 · County 023, Oregon · Built 1990 · 2 Lanes · 35 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
23B005000000000
Year Built
1990
Length
21 m (68.9 ft)
Max Span
20.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
35
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.