NUGGET STREET over CANYON CREEK
0.1 M W. JCT. HWY 395 · County 023, Oregon · Built 1972 · 2 Lanes · 111 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
44.397006, -118.948083
This bridge is in worse condition than 96.6% of bridges in County 023. The average bridge in Oregon is 0 years old; this one is 54 years old.
Nearby Bridges
INLAND ST over CANYON CREEK
Built 1972
PORTAL LANE over CANYON CREEK
Built 1972
W. IZEE STREET over CANYON CREEK
Built 2001
W. BRIDGE ST over CANYON CREEK
Built 1989
ADAM ROAD over CANYON CREEK
Built 2003
SW 4TH AVE. over CANYON CREEK
Built 1962
Lamford Drive over Canyon Creek
Built 2005
US 26 (HWY 005) over CANYON CREEK (JOHN DAY)
Built 2002
NW 3RD AVE over CANYON CREEK
Built 1989
OS 100 BRIDGE ST over JOHN DAY R(BRIDGE ST)
Built 1961
Bridge Details
- Structure #
- 23B007000000000
- Year Built
- 1972
- Length
- 9.4 m (30.8 ft)
- Max Span
- 8.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 111
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $129,000
- Total Project Cost
- $207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.