US 26 (HWY 005) over BRIDGE CRK (3RD XING)

10 MI W OF BAKER CO LINE · County 023, Oregon · Built 2006 · 2 Lanes · 279 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20048 005 18936
Year Built
2006
Length
9.8 m (32.2 ft)
Max Span
9.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
279
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.