COUNTY RD 20A over MID FK JOHN DAY RIVER

0.2 MI N JCT ORE 7 · County 023, Oregon · Built 1999 · 2 Lanes · 79 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
18475 20A 00016
Year Built
1999
Length
12.2 m (40 ft)
Max Span
11.9 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
79
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.