US 26 (HWY 005) over BRIDGE CRK (2ND XING)

10.8 MI W OF BAKER CO LIN · County 023, Oregon · Built 2007 · 2 Lanes · 279 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20047 005 18877
Year Built
2007
Length
11.9 m (39 ft)
Max Span
11.6 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
279
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.