HIGH PASS ROAD over BEAR CREEK

T16S-R5W-S3 · County 039, Oregon · Built 1995 · 2 Lanes · 1,761 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
18402 345500432
Year Built
1995
Length
20.1 m (65.9 ft)
Max Span
20.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,761
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.