HWY 200 over BEAR CREEK

06.4 MI S MONROE SCL · County 039, Oregon · Built 2011 · 2 Lanes · 1,368 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21406 200 00660
Year Built
2011
Length
61 m (200.1 ft)
Max Span
33.5 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
1,368
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.