OR 36 (HWY 229) over LONG TOM RIVER

001 E CHESHIRE PO · County 039, Oregon · Built 1995 · 2 Lanes · 3,445 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
17441 229 04781
Year Built
1995
Length
31.4 m (103 ft)
Max Span
31.4 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
3,445
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.