OR 138 (HWY 138) over TOKETEE POINT VIADUCT

58.5 MI E OF OR 99 JCT · County 019, Oregon · Built 1963 · 2 Lanes · 583 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
16862 073 05751
Year Built
1963
Length
22.3 m (73.2 ft)
Max Span
21.3 m
Width
4.4 m (14.4 ft)
Lanes
2
Daily Traffic
583
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.