OR 138 (HWY 138) over FISH CREEK

55.5 MI E OF HWY 99 · County 019, Oregon · Built 1962 · 2 Lanes · 583 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
16860 073 05545
Year Built
1962
Length
103 m (337.9 ft)
Max Span
53.3 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
583
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.