OR 138 (HWY 138) over PP&L PENSTOCK

56.8 MI E OF HWY 99 · County 019, Oregon · Built 1962 · 2 Lanes · 583 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

43.273631, -122.450311

This bridge is in worse condition than 39.4% of bridges in County 019. The average bridge in Oregon is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
16861 073 05683
Year Built
1962
Length
38.4 m (126 ft)
Max Span
7.6 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
583
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.