SHELBURN DRIVE over BEAR CREEK

03.2 MILE NORTH SCIO · County 043, Oregon · Built 1978 · 2 Lanes · 489 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
14008A000500448
Year Built
1978
Length
18.3 m (60 ft)
Max Span
8.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
489
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.