PALMER CR RD over W. FORK PALMER CREEK

2.5 MI S DAYTON · County 071, Oregon · Built 1979 · 2 Lanes · 512 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
11796 033 00060
Year Built
1979
Length
18.3 m (60 ft)
Max Span
17.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
512
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.