WEBFOOT ROAD over W. FK. PALMER CREEK
0.2 S DAYTON · County 071, Oregon · Built 1959 · 2 Lanes · 566 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 4 | Poor |
Location
45.212, -123.0851
This bridge is in worse condition than 91.3% of bridges in County 071. The average bridge in Oregon is 0 years old; this one is 67 years old.
Nearby Bridges
Fletcher Road over OR 18 (Hwy 39)
Built 1957
OR 221 (HWY 150) over Palmer Creek
Built 1984
OR 18 (Hwy 39) over OR 221 (Hwy 150)
Built 1957
STRINGTOWN ROAD over PALMER CREEK
Built 1975
OR 18 (Hwy 39) over Yamhill River
Built 1957
PALMER CR RD over W. FORK PALMER CREEK
Built 1979
PALMER CR RD over PALMER CREEK
Built 1960
LAFAYETTE HWY over YAMHILL RIVER
Built 2008
HWY 154 over Farmer River
Built 1932
KIMSEY ROAD over PALMER CREEK
Built 1979
Bridge Details
- Structure #
- 11773 000
- Year Built
- 1959
- Length
- 19.5 m (64 ft)
- Max Span
- 6.4 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 566
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $205,000
- Total Project Cost
- $328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.