PALMER CR RD over PALMER CREEK

3.2 MI S OF DAYTON · County 071, Oregon · Built 1960 · 2 Lanes · 615 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
11795A033 00178
Year Built
1960
Length
93.6 m (307.1 ft)
Max Span
14 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
615
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,081,000
Total Project Cost
$1,730,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.