BOYD ACRES #2 ROAD over PILOT BUTTE CANAL NORTH
004 MI N OF STUDIO ROAD · County 017, Oregon · Built 1965 · 2 Lanes · 10,864 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.081361, -121.295419
This bridge is in worse condition than 52.6% of bridges in County 017. The average bridge in Oregon is 0 years old; this one is 61 years old.
Nearby Bridges
BOYD ACRES ROAD over NORTH UNIT MAIN CANAL
Built 1965
US 97 (HWY 004) over BUTLER MKT. RD.
Built 1997
Hwy 017 over U.S.B.R. Canal
Built 1993
Mt. Washington Dr. over Deschutes River
Built 2009
DIVISION STREET over C.O.I. NORTH CANAL
Built 1940
017 over BNSF
Built 1962
US 97 (HWY 004) over 3RD STREET
Built 1997
DIVISION STREET over NORTH UNIT MAIN CANAL
Built 1935
EMPIRE AVE over B.N.R.R.
Built 1986
BRINSON BLVD over PILOT BUTTE CANAL
Built 1993
Bridge Details
- Structure #
- 09410 D05 00026
- Year Built
- 1965
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 10,864
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $157,000
- Total Project Cost
- $251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.