EMPIRE AVE over B.N.R.R.
N. BEND .25 E OF HWY 4 · County 017, Oregon · Built 1986 · 5 Lanes · 11,016 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.090811, -121.299861
This bridge is in worse condition than 18.6% of bridges in County 017. The average bridge in Oregon is 0 years old; this one is 40 years old.
Nearby Bridges
HWY 004 NB Ramp over US 97 (HWY 004)
Built 2024
EMPIRE AVE. over US 97 (HWY 004)
Built 1997
US 20 (HWY 017) WB over US 97 (HWY 004) WB
Built 1961
SISTERS INTER CO over US 97 (HWY 004)
Built 2001
BOYD ACRES #2 ROAD over PILOT BUTTE CANAL NORTH
Built 1965
BOYD ACRES ROAD over NORTH UNIT MAIN CANAL
Built 1965
US 97 (HWY 004) over BUTLER MKT. RD.
Built 1997
Mt. Washington Dr. over Deschutes River
Built 2009
Archie Briggs Rd over DESCHUTES RIVER
Built 1973
ARCHIE BRIGGS RD over DESCHUTES RIVER
Built 1973
Bridge Details
- Structure #
- 17C59 333500050
- Year Built
- 1986
- Reconstructed
- 1997
- Length
- 39.6 m (129.9 ft)
- Max Span
- 15.2 m
- Width
- 28 m (91.9 ft)
- Lanes
- 5
- Daily Traffic
- 11,016
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $416,000
- Total Project Cost
- $666,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.