DIVISION STREET over NORTH UNIT MAIN CANAL
013 MI. SOUTH OF HWY. 97 · County 017, Oregon · Built 1935 · 2 Lanes · 23,351 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.076183, -121.305444
This bridge is in worse condition than 90.4% of bridges in County 017. The average bridge in Oregon is 0 years old; this one is 91 years old.
Nearby Bridges
DIVISION STREET over C.O.I. NORTH CANAL
Built 1940
Hwy 017 over U.S.B.R. Canal
Built 1993
017 over BNSF
Built 1962
Mt. Washington Dr. over Deschutes River
Built 2009
US 97 (HWY 004) over 3RD STREET
Built 1997
US 97 (HWY 004) over BUTLER MKT. RD.
Built 1997
BOYD ACRES ROAD over NORTH UNIT MAIN CANAL
Built 1965
US 97 (HWY 004) over REVERE AVE
Built 1997
BOYD ACRES #2 ROAD over PILOT BUTTE CANAL NORTH
Built 1965
US 97 (HWY 004) over OLNEY AVE
Built 1997
Bridge Details
- Structure #
- 17B002000000000
- Year Built
- 1935
- Length
- 7 m (23 ft)
- Max Span
- 6.4 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 23,351
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $74,000
- Total Project Cost
- $118,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.