ON RAMP TO HWY 4 over US GOVT CANAL

011 MI S JCT WITH HWY 50 · County 035, Oregon · Built 1959 · 2 Lanes · 1,263 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
08510 004C27368
Year Built
1959
Length
61 m (200.1 ft)
Max Span
28.7 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
1,263
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.