OR 39 (HWY 050) SB over US 97 (HWY 004) NB

0002 MI S HWY 04 JCT · County 035, Oregon · Built 1962 · 2 Lanes · 6,306 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
08343 050X00667
Year Built
1962
Length
92 m (301.8 ft)
Max Span
30.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
6,306
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$967,000
Total Project Cost
$1,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.