US 97 (HWY 004) over NEVADA AVE

010 MI S HWY 50 JCT · County 035, Oregon · Built 1959 · 4 Lanes · 7,421 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
08344 004 27362
Year Built
1959
Length
50.6 m (166 ft)
Max Span
20.1 m
Width
21.1 m (69.2 ft)
Lanes
4
Daily Traffic
7,421
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$532,000
Total Project Cost
$850,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.