OR 22 (HWY 30) WB over OR 221 (HWY 150) Conn

IN W SALEM · County 053, Oregon · Built 1952 · 2 Lanes · 22,196 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
07366 030C02562
Year Built
1952
Reconstructed
1984
Length
45.6 m (149.6 ft)
Max Span
18.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
22,196
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$479,000
Total Project Cost
$766,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.