OR 22 (HWY 30) CON over Wallace Marine Park

IN W SALEM · County 053, Oregon · Built 1953 · 3 Lanes · 22,964 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
07253R030C02582
Year Built
1953
Reconstructed
1984
Length
91.4 m (299.9 ft)
Max Span
15.2 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
22,964
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.