OR 22 (HWY 30) WB over Willamette River

IN SALEM · County 047, Oregon · Built 1953 · 4 Lanes · 44,573 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
07253B030 02595
Year Built
1953
Reconstructed
1984
Length
729.4 m (2393 ft)
Max Span
76.8 m
Width
20 m (65.6 ft)
Lanes
4
Daily Traffic
44,573
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,963,000
Total Project Cost
$28,740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.