HWY 130 over Bear Creek

048 MI E HWY 9 JCT · County 057, Oregon · Built 1954 · 2 Lanes · 576 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
01860 130 00476
Year Built
1954
Length
19.2 m (63 ft)
Max Span
8.8 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
576
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.