HWY 130 over Little Nestucca River

060 MI E HWY 9 JCT · County 057, Oregon · Built 1951 · 1 Lanes · 576 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
01858A130 00597
Year Built
1951
Length
54.9 m (180.1 ft)
Max Span
36.6 m
Width
6.2 m (20.3 ft)
Lanes
1
Daily Traffic
576
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$576,000
Total Project Cost
$922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.