Hwy 130 over Little Nestucca River

076 MI E HWY 9 JCT · County 057, Oregon · Built 1951 · 1 Lanes · 674 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01857A130 00755
Year Built
1951
Length
91.4 m (299.9 ft)
Max Span
45.7 m
Width
6.2 m (20.3 ft)
Lanes
1
Daily Traffic
674
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$961,000
Total Project Cost
$1,537,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.