HWY 3 SB over OSWEGO CREEK
1.0 M S OF TERWILLIGER BV · County 005, Oregon · Built 1930 · 1 Lanes · 8,805 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
45.410469, -122.664092
This bridge is in worse condition than 80.4% of bridges in County 005. The average bridge in Oregon is 0 years old; this one is 96 years old.
Nearby Bridges
HWY 3 NB over OSWEGO CREEK
Built 1983
MCVEY AVE over OSWEGO LAKE OUTLET
Built 1976
NORTH SHORE DRIVE over LAKEWOOD BAY
Built 1929
SUMMIT DR over SPRR
Built 1954
SUMMIT DRIVE over SPRINGBROOK CREEK
Built 1956
OATFIELD ROAD over KELLOGG CREEK
Built 1953
SE Washington St over Kellogg Creek
Built 2018
OR 99E(Hwy 81) over Kellogg Lake Outlet
Built 1934
SOUTH SHORE BLVD over OSWEGO CANAL
Built 2005
HWY 3 over RIVERSIDE CANYON
Built 1926
Bridge Details
- Structure #
- 00409 003 00676
- Year Built
- 1930
- Length
- 100.7 m (330.4 ft)
- Max Span
- 39.6 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 1
- Daily Traffic
- 8,805
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,031,000
- Total Project Cost
- $1,650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.