HWY 3 over RIVERSIDE CANYON

0.04 MI N RIVERWOOD ROAD · County 051, Oregon · Built 1926 · 3 Lanes · 14,839 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01185A003 00400
Year Built
1926
Reconstructed
1971
Length
199.7 m (655.2 ft)
Max Span
14.6 m
Width
2.4 m (7.9 ft)
Lanes
3
Daily Traffic
14,839
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.