SUMMIT DR over SPRR

00.1 MI S OF IRON MT BLVD · County 005, Oregon · Built 1954 · 2 Lanes · 993 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
06575 000 00012
Year Built
1954
Length
27.4 m (89.9 ft)
Max Span
11.6 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
993
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$288,000
Total Project Cost
$461,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.