E0695 over TYNER CREEK

3N 3.5E SH62/CHK CO LINE · County 001, Oklahoma · Built 2013 · 2 Lanes · 50 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
310670000000000
Year Built
2013
Length
12.7 m (41.7 ft)
Max Span
2.7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
50
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.