U.S. 62 over PEACH EATER CREEK

6.1 MI.E.CHEROKEE CO · County 001, Oklahoma · Built 2002 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
260590000000000
Year Built
2002
Length
49.4 m (162.1 ft)
Max Span
16.5 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$656,000
Total Project Cost
$1,838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.