4134C over DEER CREEK

1E 2N .8W OF ARLINGTON · County 081, Oklahoma · Built 1981 · 2 Lanes · 350 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 5 Fair

Location

35.608397, -96.678733

This bridge is in worse condition than 52.7% of bridges in County 081. The average bridge in Oklahoma is 0 years old; this one is 45 years old.

Nearby Bridges

Bridge Details

Structure #
199430000000000
Year Built
1981
Length
16.8 m (55.1 ft)
Max Span
16.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$232,000
Total Project Cost
$369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.