E0990 over DEER CREEK

.8 E OF ARLINGTON · County 081, Oklahoma · Built 1992 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

35.579183, -96.665833

This bridge is in worse condition than 19.3% of bridges in County 081. The average bridge in Oklahoma is 0 years old; this one is 34 years old.

Nearby Bridges

Bridge Details

Structure #
003000000000000
Year Built
1992
Length
36.9 m (121.1 ft)
Max Span
12.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.