N3560 over DEER CREEK

1E .2S OF ARLINGTON · County 081, Oklahoma · Built 1950 · 1 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 4 Poor

Location

35.575147, -96.662847

This bridge is in worse condition than 84.5% of bridges in County 081. The average bridge in Oklahoma is 0 years old; this one is 76 years old.

Nearby Bridges

Bridge Details

Structure #
119890000000000
Year Built
1950
Length
12.6 m (41.3 ft)
Max Span
11 m
Width
4 m (13.1 ft)
Lanes
1
Daily Traffic
100
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.