SR 795 EB over I80 OHIO TPK

5.5MI EAST OF EXIT 59 · County 173, Ohio · Built 1968 · 2 Lanes · 11,238 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
8729336
Year Built
1968
Reconstructed
2002
Length
130.2 m (427.2 ft)
Max Span
32.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
11,238
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.