LIME CITY ROAD over DITCH 2395 DRY CREEK
0.25 ML S OF SR 795 · County 173, Ohio · Built 2023 · 2 Lanes · 2,750 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
41.559611, -83.567469
This bridge is in worse condition than 3.5% of bridges in County 173. The average bridge in Ohio is 0 years old; this one is 3 years old.
Nearby Bridges
LIME CITY RD over I80 OHIO TURNPIKE
Built 1997
SR 795 EB over I80 OHIO TPK
Built 1968
SR 795 WB over I80 OHIO TPK
Built 1954
GLENWOOD ROAD over DRY CREEK GLENWOOD ROAD
Built 1968
I80 OH TPK over GLENWOOD RD
Built 1954
EXIT 64 RAMP over IR 80 OHIO TURNPIKE
Built 1990
I80 OH TPK over CSX TRAN RR
Built 1954
SR 795 over CSX & DRY CREEK
Built 1968
SR 795 over CSX & DRY CREEK
Built 1968
I75 NB RAMP TO I80 over I80 OHIO TPK
Built 1991
Bridge Details
- Structure #
- 8732427
- Year Built
- 2023
- Length
- 7.7 m (25.3 ft)
- Max Span
- 6.9 m
- Width
- 23.8 m (78.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,750
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $401,200,000
- Total Project Cost
- $401,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.