NB IR 75 over I80 OHIO TPK

4.9MI EAST OF EXIT 4 · County 173, Ohio · Built 1967 · 3 Lanes · 28,821 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
8729263
Year Built
1967
Reconstructed
1998
Length
87.2 m (286.1 ft)
Max Span
24.1 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
28,821
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.