SB I75 C/D ROAD over I80 OHIO TURNPIKE

I75 AT OHIO TURNPIKE · County 173, Ohio · Built 1991 · 2 Lanes · 34,890 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
8704546
Year Built
1991
Length
87.8 m (288.1 ft)
Max Span
24.1 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
34,890
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.