SR8 SB TPK RAMP over I80 OHIO TURNPIKE

3.24 MI S OF I-271 · County 153, Ohio · Built 2010 · 1 Lanes · 52,020 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
7729774
Year Built
2010
Length
67.4 m (221.1 ft)
Max Span
36.7 m
Width
11 m (36.1 ft)
Lanes
1
Daily Traffic
52,020
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.