FRONTAGE RD over I80 OH TPK

3.25 MI S OF IR 271 · County 153, Ohio · Built 2009 · 2 Lanes · 14,030 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
7700741
Year Built
2009
Length
76 m (249.3 ft)
Max Span
22.1 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
14,030
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.