SR8 over I80 OHIO TPK

0.3MI WEST OF EXIT 12 · County 153, Ohio · Built 1954 · 6 Lanes · 24,915 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
7729731
Year Built
1954
Reconstructed
2010
Length
63.7 m (209 ft)
Max Span
20.7 m
Width
44.5 m (146 ft)
Lanes
6
Daily Traffic
24,915
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.