SR 83 over BLANCHARD RUN

2.03 M N MORGAN CO. LINE · County 121, Ohio · Built 2019 · 2 Lanes · 340 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
6101624
Year Built
2019
Length
7.2 m (23.6 ft)
Max Span
6.4 m
Width
24.4 m (80.1 ft)
Lanes
2
Daily Traffic
340
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.