SR 83 over BROWNENS CREEK

1.3M S NOBLE CO. LINE · County 115, Ohio · Built 1927 · 2 Lanes · 238 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
5801087
Year Built
1927
Length
13.1 m (43 ft)
Max Span
12.8 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
238
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.