SR 83 over BLANCHARD RUN

1.51M N MORGAN CO. LINE · County 121, Ohio · Built 1996 · 2 Lanes · 338 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
6101607
Year Built
1996
Length
10.8 m (35.4 ft)
Max Span
10.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
338
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.