MIAMI STREET CO557 over NORFOLK SOUTHERN
0.27 MI S OF SR2 · County 095, Ohio · Built 2017 · 2 Lanes · 10,873 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.632011, -83.52945
This bridge is in worse condition than 18.9% of bridges in County 095. The average bridge in Ohio is 0 years old; this one is 9 years old.
Nearby Bridges
SR 65 over NORFOLK SOUTHERN RR
Built 1968
KUHLMAN DRIVE over NORFOLK & WESTERN RR
Built 1973
IR 75 over NSRR & SOUTH AVE.
Built 2023
IR 75 over NSRR & SOUTH AVE.
Built 2021
HIGH LEVEL BRIDGE over MAUMEE RIVER RRS&STREETS
Built 1931
SR 65 over CSX RAILROAD
Built 1969
IR 75 Ramp over NORFOLK SOUTHERN RR
Built 2021
IR 75 over SEGUR AVE
Built 2019
IR 75 over SR 2 NSRR & EMERALD AVE
Built 2019
IR 75 over MAUMEE RIVER
Built 2023
Bridge Details
- Structure #
- 4861109
- Year Built
- 2017
- Length
- 42.7 m (140.1 ft)
- Max Span
- 26.2 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 10,873
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $650,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.