IR 75 Ramp over NORFOLK SOUTHERN RR

285 Ft. S. of South Ave. · County 095, Ohio · Built 2021 · 1 Lanes · 5,428 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4802773
Year Built
2021
Length
67.4 m (221.1 ft)
Max Span
38.5 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
5,428
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.