IR 75 over MAUMEE RIVER

0.29 MI. N. OF COUTNY LIN · County 095, Ohio · Built 2023 · 4 Lanes · 58,370 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4802767
Year Built
2023
Length
594.2 m (1949.5 ft)
Max Span
50.6 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
58,370
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.