IR 475 over OTTAWA RIVER

1.17 Mi. E. of USR 23 · County 095, Ohio · Built 1969 · 4 Lanes · 63,957 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
4808010
Year Built
1969
Reconstructed
2006
Length
53.6 m (175.9 ft)
Max Span
20.4 m
Width
26.3 m (86.3 ft)
Lanes
4
Daily Traffic
63,957
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.