SR 120 over OTTAWA RIVER

0.04 MI E RIVA RIDGE RD. · County 095, Ohio · Built 2023 · 5 Lanes · 32,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
4804930
Year Built
2023
Length
51.1 m (167.7 ft)
Max Span
16.2 m
Width
24.2 m (79.4 ft)
Lanes
5
Daily Traffic
32,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.